Tuesday, March 8, 2011

Basement Update

Well things are moving a little faster since I returned from Atlanta.


  • Sheetrock done

  • Primer on

  • Bookshelves built

  • TV stand built

  • Tile ordered

Our list is still pretty long but it is amazing how much faster everything is moving along. Still to do, we have:



  • Paint ceilings

  • paint walls

  • trim installed

  • trim painted

  • replace back door

  • tile laid and grouted

  • carpet picked out

  • carpet installed

  • put house back together

So hopefully these things will move a lot faster. I am hoping to be done the beginning of April. Wish us luck.